Full Apartment Finishing from Shell
Jeddah · 165 m² · 62 days
The right sequence saves time and money
Most finishing problems come from the wrong order of works, not weak materials. We follow a strict sequence starting with first-fix services and ending with the final coat, document material specifications in writing, and tie payments to accepted completion stages.
How we deliver
Site visit to set the finish level and target budget.
Electrical and plumbing inside walls with pressure testing before closing.
Surfaces levelled, then gypsum works and suspended ceilings.
Filler and levelling, then the first coat before flooring.
Tiling and porcelain, then doors and wardrobes.
Final coat, lighting and switches, handover and cleaning.
Our track record
150+
Units finished
45+
Renovation projects
60 days
Average apartment finish
100%
Specs documented
An order that prevents damaging completed work and reduces rework.
Type, size and brand of every material written into the contract.
Each payment against a completed, accepted stage — not just a date.
Daily site follow-up with periodic progress reports and photos.
Both work. Our supply is faster and simpler; buying yourself gives more control — either way the specification is documented in writing.
Finishing is work on a new or shell building; renovation treats an existing building, starting with core repairs such as leaks and cracks before cosmetic work.
Daily site supervision with periodic photo reports and completion percentages, plus a meeting at every handover stage.