Villa Roof — Waterproofing and Thermal
Treating a recurring leak in the top-floor ceilings, then double insulation that stops water and cuts heat.
Location
Jeddah
Area
230 m²
Duration
4 days
Year
2026
Client
Private client
The challenge
Damp patches kept appearing on top-floor ceilings despite insulation applied three years earlier — meaning the roof was not the only source.
What we delivered
We began with instrument leak detection and found a crack around a pipe outlet plus untreated gutter areas. After fixing the source we installed bituminous waterproofing turned 25 cm up the walls, a thermal layer above it, and flood-tested for 48 hours before handover.
Project specification
| المساحة | 230 م² |
|---|---|
| العزل المائي | رولات بيتومين ملحومة |
| العزل الحراري | ألواح فوق المائي |
| الرفع على الجدران | 25 سم |
| الاختبار | غمر 48 ساعة |
| الكشف | أجهزة بدون تكسير |
Scope of works
- كشف التسرب وتحديد المصدر
- معالجة الشقوق والمخارج
- تنظيف وتجهيز السطح
- تنفيذ الميول
- العزل المائي والحراري
- اختبار الغمر
Have a similar project?
Free site visit and a detailed quote within 24 hours.
About our Insulation service