Guard Rooms for a Residential Project

Guard Rooms for a Residential Project

Three identical guard rooms, built in the workshop and delivered ready to operate.

Location

Jeddah

Area

3 units — 3×3 m

Duration

10 days

Year

2026

Client

Residential project

The challenge

The project needed guard rooms urgently before phase-one handover, with cooling capable of long summer operating hours.

What we delivered

We built all three units in parallel in 5 cm panels, with wide vision windows, pre-wired outlets and air conditioning fitted before shipping — so they were operating the day they arrived.

Project specification

عدد الوحدات3 غرف
المقاس3 × 3 متر
سماكة الألواح5 سم
النوافذرؤية واسعة زجاج مزدوج
التكييفمركّب قبل الشحن
قابلية النقلقواعد رفع بالونش

Scope of works

  • تحديد المواصفات
  • التصنيع بالورشة
  • التمديدات والتكييف
  • الفحص قبل الشحن
  • النقل والرفع
  • التركيب والتشغيل

Have a similar project?

Free site visit and a detailed quote within 24 hours.

About our Prefab Rooms service
All projects